How to connect the air curtain machine with the wind wheel

DATE OF ISSUE:2020-12-07

How to connect the air curtain machine with the wind wheel

Installation method:

1. Just loosen the positioning screw at the front and bottom of the fuselage, separate the fuselage and the bottom plate, and fix the bottom plate firmly on the door frame or wall (vibration and noise will be caused if the fixing is not tight), hang the body directly on the floor, and fix the body on the bottom plate with the removed positioning screw as original.

Note: Do not omit to install the rubber shock absorber when hanging the machine. In addition to the same model as above, the RFMS type installation should be fixed with a hanging hole. It is strictly prohibited to fix the machine without the baseplate, only by lifting.Otherwise, it will cause mechanical vibration and noise, and affect the service life of the machine, and check whether the power supply voltage and the selected switch wire section is consistent with the installed air curtain machine.

2. RFMS series water-heating and hot air curtain machine is installed on the indoor side of doors and Windows to prevent the water in the coil of heat exchanger from freezing and cracking.

3, according to the selection of different heat media, should be equipped with the corresponding water supply and drainage pipeline, and the pipeline to do heat preservation treatment, with hot water as the medium, the lower inlet, upper return water, in the return water outlet or on the height of the main pipe should be installed automatic air release valve.

4. When using hot water as medium, use softened water.

5. Before each work of the hot air curtain machine, condensate water or mixed gas in the heat exchanger should be discharged first, preheat for 10 minutes, and then start the hot air curtain machine. When the hot air curtain machine is stopped, all the water in the coil tube must be discharged.

6, water heating hot air curtain machine in the winter work, the requirement of thermal energy can be continuous or timing supply, in order to ensure the air curtain machine working state.

7, extend the service life of the motor, do not allow only heating, do not start the fan working method.

Notes for use of air curtain machine

(1) Before use, the user shall read the operation instructions in detail, and fully grasp the structure, performance, installation, use and maintenance methods of the air curtain machine and matters needing attention.

Once the fan is found to have any problem, it should stop at any time and check immediately.

(3) Regularly remove foreign bodies in the pipes before and after the fan, in case of accidents, the lubrication grease of the driving part should be replaced regularly, and the fan should take rainproof measures in the open air.

(4) In case of changes in weather conditions, the valve should be used to regulate the air volume.

(5) Regularly measure the current of the fan motor. Under normal circumstances, the measured current should be less than the rated current.


WhatsApp

WhatsApp:

+86 13925417088

WECHAT

CODE
FOCUS ON US

MOBILE

SERVICE HOTLINE:

4000757669

ADDRESS

No.33, Liujia Industrial Zone, Southwest Street, Sanshui District, Foshan City, Guangdong Province

TEL

SERVICE HOTLINE:

4000757669

TOP